INSTALLATION, USE AND
MAINTENANCE
SUNWAY STRING BOX
LT 1500V 24 INPUTS
Rev. 02 - Error! Unknown document property
name.
13 / 43
1000 V high-voltage insulated gloves
Throughout operations
Dielectric helmet
Throughout operations
Safety footwear/dielectric boots
Throughout operations
Insulated tools
Throughout operations
Operators must also be provided with a suitable means of communication for
contacting the emergency services if necessary.
Note
It is always advisable to work on the electrical cabinets with THE POWER SUPPLY
SWITCHED OFF and the equipment in safety conditions (please refer to section 2.8).
2.7. Execution of Work
Maintenance, configuration modifications and management operations require the involvement of all
production and maintenance personnel. These activities
must be carried out in observance of health
and safety regulations.
The Standards and Laws governing this aspect vary depending on the personnel involved, methods of
access and/or the tasks which may be carried out on the product and envisage constructive measures aimed
at guaranteeing adequate levels of safety.
Standard EN 50110-1, second edition, identifies the people who are granted access to the product:
•
Person in charge of running the electrical system (System Manager).
•
Person in charge of work activities (Works Supervisor).
•
Skilled electrician.
•
Instructed person.
Please refer to section 0.
Standard EN 50110-1 governs the way work in a plant is carried out and the relationship between the
aforementioned persons who may work on the plant to maintain the electrical safety conditions stipulated
by European Directives.
This standard and its national equivalents must therefore be adhered to whenever it is necessary to access
a PV system.