12.1.5 To check the functionality and the battery capacity, perform a discharge in accordance
with Section 8.3 “Capacity test”.
12.1.6
If individual cells show a fault and should be replaced, proceed according Section 8.6.5
Replacement of battery segment or individual
cells”.
12.1.7 If you continue to operate the batteries in the train or if a fault can’t be found on the
dismounted battery, check and verify the conditions of use and the proper functioning of
the battery system. Follow it to the information in Section 8.1.1 “Checking of charge and