Enerdis Enerium 100 Installation Manual Download Page 1

M

M

S

S

1

1

-

-

7

7

3

3

9

9

8

8

 

 

/

/

 

 

0

0

1

1

 

Page 1 / 2 

 

 INSTALLATION 

MANUAL 

 

Enerium 100 – 200 – 300  

LCD Screen 

Validation Key « OK » 

Optical head interface 

Navigation key 

Function 

 

On-off or Analogue input / output 

Optical head interface  

Current inputs 

Voltage  inputs 

RS485 communication interface 

Ethernet communication connection 

Power supply 

Function 

Enerium 100 – 200 – 300 

 

Enerium 110 – 210 – 310  

Hole for fastening on grating 

Optical head interface 

Remote communication interface 

DIN rail mounting accessory 

Function 

 

S

AFETY

 

You  have  received  a  power  monitor  ENERIUM  100, 110, 200, 210,  300 or 
310 and we thank you for your confidence.  

  To install this device with best conditions: 

 

Read this manual and the user’s manual MS1-7352 (available on the CD 
enclosed  with  the  box)  and  respect  installation  instructions  specified  in 
those two documents.  

 

This  device  is  expected  to  be  used  in  category  III  installations  with  a 
pollution degree of 2, in accordance with the standard IEC 61010-1. 

I

NSTALLATION 

I

NSTRUCTIONS

 

The  device  described  in  this  manual  is  expected  to  be  used  only  by 
authorized or trained users. 

When the instrument is received, check that it is complete and has not been 
damaged during transport. In case of unsafe suspected on the product, it must 
be put out of order.  

Before proceed to product electrical installation:   

 

 

Check that the power supply is disconnected and locked out in accordance 
with good practice and safety rules. 

 

Check  that the  network  voltage  and the  required  product  voltage  are  the 
same. 

To  be  aware  of  others  instructions,  please  consult  the  handbook  MS1-7352 
(Available on the CD enclosed with the box). 

M

ECHANICAL INSTALLATION

 

ENERIUM 100, 200 or 300 have to be always installed on a panel. Proceed 
as follows: 

1. Withdraw the four panel attachments. To withdraw a panel attachment, lift   

    the front before sliding it. (figure 2) 

2. Make a cut-out in the panel as shown by the figure 1 

3. Insert the Enerium in the cut-out.  

4.  Slide  the  four  panel  attachments  and  push  them  until  they  hold  the 
Enerium securely. (Figure 2) 

Panel 
attachement 

Figure 2 

Figure 1 

 

 

 

ENERIUM 110, 210 or 310 (version without LCD) can be installed on a DIN 
rail or in the back of a cabinet.. Proceed as follow: 

1. Clip  the    two    supports   on   the  
DIN  rail  (158mm centres between 
screws). 

2.  Attach  the  monitor  to  the  two 
supports 

with 

screws 

(four 

different  heights  are  possible). 
Figure 3 

 

For  the  installation  in  back  of 
cabinet,  screw  the  power  monitor 
directly to the back of the cabinet. 

Vis 

Support 

Rail

Figure 3

 

 

E

LECTRICAL SPECIFICATIONS

 

Voltage inputs 
 

Un = 100V / 400 V 
Umax = 480 V 
Burden < 0,1 VA 

Current inputs 
 

In = 5 A 
Imax = 6,5 A 
Burden < 0,15 VA 

Auxiliary power supply 

80 … 265 Vac 

(42,5 … 69 Hz) & 110 

… 375 Vdc 

Consumption < 20 VA 
19,2 … 57,6 Vdc 

(Low level version)

 

Burden < 9 W 

On-off  inputs 
 

10 … 70Vdc 
Burden < 0,5W 

On-off outputs 
 

24 … 230Vac 

±

10% 

24 … 110Vdc 

±

20% 

Burden 

 100mA 

Analogue outputs 
 

-20 mA 

 Isortie 

 20 mA, avec Imax = 22mA 

Rmax (

) = 10V/Ioutput 

0,1 

µ

F max 

Analogue inputs 

0 … 20 mA with Imax=22mA 

Rmax (

) = 50

 

Burden < 50mW 

E

LECTRICAL CONNECTIONS 

V

 

&

 

The    insertion    of    fuses    on    the    voltage    inputs    and    a  system  for  short-
circuiting the current inputs is strongly recommended. 

You will find below the mains wiring diagram on electrical network.   

To be aware of the other wiring diagram, please consult the handbook MS1-
7352 (Available on the CD enclosed with the box). 

Reviews: