Commissioning
7
Commissioning
The following chapter explains the basic procedure for initial or repeated
generator start-ups in “direct supply" mode. Perform the following de-
scribed steps when you put your generator into operation for the first time
or again after transport.
NOTICE!
For start-up and operation of a Generators on building and assembly sites,
Deutsche Gesetzliche Unfallversicherung (DGUV) in DGUV Information
203-032, the May 2016 edition, requires observance of special protective
measures and behaviour regulations.
Be sure to refer to the following section for a summary of this DGUV infor-
mation. It supplements the operating manual for this special application.
We also urgently advise observance of relevant DGUV information under
comparable operating conditions.
We recommend that you read DGUV Information 203-032 before starting the ini-
tial commissioning. When in doubt, consult a qualified electrician.