Installation
Overfill Prevention System SOP300
18
Hauser
5.3
Mounting the field signalization system
The strobe light and siren must be mounted on a stable and even apparatus using the
dimensioned drawings provided below. If possible, the devices should be mounted with the
cable glands pointing downwards.
5.4
Post-installation check
Are the mounted components undamaged (visual inspection)?
Do all the components meet the required specifications? For example:
• Ambient temperature
• Humidity
• Explosion protection
Is the correct orientation selected?
Are the measuring point identification and labeling correct (visual inspection)?