Smart System for Aquacultures SSP200B
Electrical connection
Hauser
21
2. Connect the sensor cable of ammonium and nitrate sensor CAS40D to
connection
port 2
.
SSP200B for salt water applications: connecting the sensors
1. Connect the measuring cable of oxygen sensor COS51D to
connection port 1
.
2. Connect the sensor cable of ammonium and nitrate sensor CAS40D to
connection
port 2
.
6.5
Electrical connection of Modbus Edge Device
6.5.1
Preparing the Modbus Edge Device
Modbus Edge Device
UNO POWER
DC OK
Output DC
24V 30W
L
N
Input AC
100V-240V
1
N
1
Teltonica
LTE
Modem
Kunbus
RevPi 3
2
8
9
7
(CPU)
Power
A1
A2
5
L
2 3
4 5 6 7 8
3
1
4
6
A0037744
18
Modbus Device Edge preparation
1
Antenna connection cables for LTE antenna and LTE modem
2
Cable gland at connection port C
3
Cable gland at connection port D
4
Teltonica LTE modem
5
CPU (Kunbus RevPi 3)
6
Power unit, only for Modbus Edge Device 100 to 240 VAC
7
Free connection of Teltonica LTE modem
8
Split cable gland
9
Ethernet cable (Modbus TCP connection)
1. Open the housing of the Modbus Edge Device → 17.
2. Mount the antenna head.
3. Secure the split cable gland on the Ethernet cable.
4. Mount the split cable gland with the Ethernet cable on
connection port F
.
5. Connect the Ethernet cable to the free connection of the Teltonica LTE modem.