Installation
Proline Promass F 100 Modbus RS485
26
RUPTURE DISK
i
2
3
1
DN 8 ( ")...150 (6")
!
⁄#
DN 250 (10")
2
3
A0028903
1
Rupture disk label
2
Rupture disk with 1/2" NPT internal thread with 1" width across flat
3
Transport protection
Zero point adjustment
All measuring devices are calibrated in accordance with state-of-the-art technology.
Calibration takes place under reference conditions→ 100. Therefore, a zero point
adjustment in the field is generally not required.
Experience shows that zero point adjustment is advisable only in special cases:
• To achieve maximum measuring accuracy even with low flow rates.
• Under extreme process or operating conditions (e.g. very high process temperatures or
very high-viscosity fluids).
6.2
Mounting the measuring device
6.2.1
Required tools
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2
Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.