Promag 50
Installation
Hauser
43
3.4
Post-installation check
Perform the following checks after installing the measuring device in the pipe:
Device condition and specifications
Notes
Is the device damaged (visual inspection)?
-
Does the device correspond to specifications at the measuring point, including
process temperature and pressure, ambient temperature, minimum fluid
conductivity, measuring range, etc.?
Installation
Notes
Does the arrow on the sensor nameplate match the actual direction of flow
through the pipe?
-
Is the position of the measuring electrode plane correct?
Is the position of the empty pipe detection electrode correct?
Were all screws tightened to the specified torques when the sensor was installed?
Promag L
Promag W
Promag P
Were the correct seals used (type, material, installation)?
Promag D
Promag L
Promag W
Promag P
Promag H
Are the measuring point number and labeling correct (visual inspection)?
-
Process environment / process conditions
Notes
Were the inlet and outlet runs respected?
Inlet run
5 × DN
Outlet run
2 × DN
Is the measuring device protected against moisture and direct sunlight?
-
Is the sensor adequately protected against vibration (attachment, support)?
Acceleration up to 2 g by
analogy with IEC 600 68-2-8