OxyMax W COS 71
3 Installation
Hauser
11
3.5
Post-installation check
After installing the sensor, carry out the following checks:
Checks
Remarks
Membrane OK (visual inspection)?
Replace membrane if there is a leak.
Compliance with permissible sensor installation position? see Chapter 3.3
Sensor installed tightly in flow assembly?
Avoid leakages.
Right flow set ?
See Technical data in chapter 9.
Summary of Contents for OxyMax W COS 71
Page 2: ......