Liquiline System CA80TN
Mounting
Hauser
19
Mounting the Y strainer on an even surface
4
3
2
1
5
A0030604
17
Y strainer
1
Union nut
2
Hose to analyzer
3
Threaded joint
4
Ferrule
5
Threaded borehole
1. Mount the Y strainer on the pipe clamps on an even surface.
2. Align the Y strainer.
Sticking the adhesive fittings
3. Clean the adhesive surfaces (tube end on outside, sleeve or angle piece on inside)
with a cleaning cloth.
4. Allow the cleaned surfaces to dry for approx. 5 minutes.
5. Apply the glue evenly (closed adhesive layer) to the surfaces (first sleeve, then pipe).
6. Join the parts together immediately (screw them together as far as possible).
7. Remove any surplus glue.
8. Allow the glue on the glued parts to set for at least 24 hours before running sample
through the system.
Securing the sample hose
9. Turn the union nut to remove it.
10. Secure the threaded joint and ferrule supplied on the hose to the analyzer.
11. Screw the hose with the ferrule and threaded joint into the threaded borehole.
12. Turn the union nut to secure it.
5.3
Post-mounting check
After mounting, check all the connections to ensure they are secure.
Summary of Contents for Liquiline System CA80TN
Page 2: ......
Page 162: ...www addresses endress com 71593684 71593684 ...