![Endress+Hauser Flowmeter Proline 500 Brief Operating Instructions Download Page 16](http://html.mh-extra.com/html/endress-hauser/flowmeter-proline-500/flowmeter-proline-500_brief-operating-instructions_2407476016.webp)
Mounting
Flowmeter Proline 500
16
Hauser
4.5
Transmitter post-installation check
The post-installation check must always be performed after the following tasks:
• Mounting the transmitter housing:
• Post mounting
• Wall mounting
• Turning the transmitter housing
• Turning the display module
Is the device undamaged (visual inspection)?
Turning the transmitter housing:
• Is the securing screw firmly tightened?
• Is the connection compartment cover screwed on tightly?
• Is the securing clamp firmly tightened?
Turning the display module:
• Is the connection compartment cover screwed on tightly?
• Is the securing clamp firmly tightened?
Post and wall mounting:
Are the securing screws firmly tightened?
Summary of Contents for Flowmeter Proline 500
Page 47: ......