Operation
Cleanfit P CPA472D
20
Hauser
4
Operation
4.1
First commissioning
Before the first commissioning, make sure of the following items:
• All seals are correctly seated (on the assembly and process connection).
• The sensor is correctly installed and connected.
• The water supply line is correctly connected to the rinse connections (if fitted).
#
Warning!
Danger of squirting medium.
Before applying the process pressure to the assembly, make sure the connections are correctly fitted.
If you use a manual outlet valve for the rinse chamber as a vent valve, ensure the counter side of
the rinse chamber is closed by the dummy plug. Otherwise the assembly may
not
be put into the
process!
4.2
Operating elements
Use the stop lock bolt to lock or release the retractable pipe (Fig. 17, Fig. 18).
When using manually operated assemblies, the retractable pipe can be locked in both, the
"Measuring" position and the "Service" position. When using pneumatically operated assemblies,
this can only be done in the "Service" position.
Releasing the stop lock bolt:
1.
Pull the bolt out.
2.
Turn the bolt by 90° so that the plastic grooves rest on the metal edge.
Locking the stop lock bolt:
3.
Turn the stop lock bolt through 90° so that the plastic grooves are located above the recesses.
4.
When the retractable pipe is turned clockwise, the bolt engages.
a0002744
Fig. 17:
Releasing the stop lock bolt
a0002745
Fig. 18:
Locking the stop lock bolt