![Endress+Hauser analytikjena SPECORD PLUS Operating Manual Download Page 18](http://html1.mh-extra.com/html/endress-hauser/analytikjena-specord-plus/analytikjena-specord-plus_operating-manual_2407688018.webp)
Installation and commissioning
SPECORD PLUS
18
5
Installation and commissioning
5.1
Installation conditions
5.1.1
Installation location requirements
Ambient conditions
The climate conditions for the installation location are listed in the technical specifica-
tions (→ "General technical data of the SPECORD PLUS"
the room is temperature-controlled.
Laboratory conditions
The device is only approved for indoor use. The installation location should have the
characteristics of a chemical laboratory. It must meet the following conditions:
¡
Environment with low dust levels
¡
No vibrations
Installation location require-
ments
The requirements for the installation location of the device are as follows:
¡
No caustic vapor in the immediate vicinity of the device and its system components.
These can corrode the device connections and modules.
¡
No drafts; do not install the device close to windows or doors
¡
Away from electromagnetic sources of interference
¡
No direct sunlight and away from radiant heaters
¡
Do not obstruct the air vents of the device with other equipment
5.1.2
Power supply
WARNING
Risk of electric shock
The device may only be connected to a properly earthed power outlet in accordance with
the voltage specifications on the type plate.
The SPECORD PLUS operates on single-phase alternating current.
Electrical connection require-
ments
Operating voltage
85 to 264 V/AC
Line frequency
50 to 60 Hz
Power consumption
200 VA
Device fuses
T 3.15 AH/250 V, type 19181