background image

www.

en

c

loscreens

.com

5

ASSEMBLY

 INSTRUCTIONS

ZP19052

 

b

1. 

Insert (9) Horizontal Pickets 

(H)

 into the routed 

holes in one of the posts.

 

b

2. 

Starting at one end of the opposite post, guide 

the pickets into the routed holes in the post.

STEP 2:

 

ASSEMBLE

 FULL PANEL

 

b

Identify the Front Panel Top Rail 

(F)

 and the Front Panel Bottom Rail 

(D)

 as shown below. 

Pressure fit (2) loose Rail End Caps 

(B)

 into the ends of each rail. Set these rails aside for now.

STEP 2.1

STEP 2.2

D

STEP 2.3

H

2¾”

4¾”

Note:

 

Identify the top 

of the screen by finding 

the side of the posts 

with pre-drilled holes 

2¾” from the end of the 

posts.

4¾”

2¾”

 

b

Take (2) Posts 

(G)

 and position them so the 

routed holes face in towards each other as 

shown.

G

F

B

1

2

Summary of Contents for Liberty Lattice ZP19052

Page 1: ...www encloscreens com 45 min Approximate assembly time for 3 screens Scan the QR code for an assembly video VER 081821 ASSEMBLY INSTRUCTIONS ZP19052 AC Screen Kit 36 W x 42 H Lattice Liberty...

Page 2: ...vice department parts nychbrands com support encloscreens com 704 892 5222 877 234 6196 Customer service agents are available to take calls weekdays from 9am 5pm EST If you call outside of business ho...

Page 3: ...www encloscreens com 3 ASSEMBLY INSTRUCTIONS ZP19052 Detailed Product Dimensions Specifications 36 in 39 in 34 1 2 in 36 in 40 in 2 1 4 in 2 1 4 in 4 in 42 1 2 in...

Page 4: ...al Picket 27 1 x x 33 labeled 1 24 1 x x 35 labeled 2 Rail End Cap 12 6 installed 6 loose Self Tapping Stainless Steel Screw 24 For panel assembly 4 Self Drilling Stainless Steel Screw 8 for Side Pane...

Page 5: ...PANEL b Identify the Front Panel Top Rail F and the Front Panel Bottom Rail D as shown below Pressure fit 2 loose Rail End Caps B into the ends of each rail Set these rails aside for now STEP 2 1 STEP...

Page 6: ...p b 2 Align the pre drilled holes in the posts and the front bottom rail b 3 Drive 4 3 4 Self Drilling Stainless Steel Screws J into the pre drilled holes on the front and back of the front bottom rai...

Page 7: ...o the front top rail and slide it down until the pre drilled holes in the front top rail align with the holes in the post b 3 Drive 4 3 4 self drilling stainless steel screws into the aligned pre dril...

Page 8: ...b 2 Drive 4 4 Self Drilling Stainless Steel Screws K into the pre drilled holes in the side panel top and bottom rails b 3 Repeat this process on the other side with the third screen as shown below S...

Page 9: ...encloscreens com 9 ASSEMBLY INSTRUCTIONS ZP19052 www encloscreens com support encloscreens com 704 892 5222 877 234 6196 6935 Reames Rd Ste K Charlotte NC 28216 VER 081821 ASSEMBLY INSTRUCTIONS ZP190...

Reviews: