
April 2021
Installation, Operation and Maintenance Manual
VA-DC-000-1952 Rev. 0
13
Section 3: Electrical Connections
Electrical Connections
Section 3: Electrical Connections
3.1
Main Electrical Connections
Refer to the project specific wiring diagram for the electrical connections to the MCC.
3.2
Sealing Cable / Conduit Entries
Seal the cable and conduit entries in accordance with the National Electric Code or your country
standard and applicable local codes. All conduit entries should be sealed against the site
environment. All unused conduit entries must be sealed with threaded metal plugs.
!
WARNING
Always verify electrical power is disconnected before opening the motor starter enclosure.