Hardware Preparation and Installation
2.1
Overview
z
Inspect the shipment and unpack the RTM.
z
Make sure environmental and power requirements are met.
z
Install the RTM.
2.2
Unpacking and Inspecting the RTM
The shelf should provide minimum airflow to the RTM slot according to the class B.3
requirements of the CP-TA Inter-operability document AdvancedTCA Book 1.1. This includes
the following:
z
2.0 cfm at 25 °C ambient temperature
z
2.8 cfm at 40 °C ambient temperature
z
4.4 cfm at 55 °C ambient temperature
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
z
Printed
Quick Start Guide
and
Safety Notes Summary
z
RTM-ATCA-F125
Damage of Circuits
z
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten its life.
z
Before touching the blade or electronic components, make sure that you are working in
an ESD-safe environment.
Summary of Contents for RTM-ATCA-F125
Page 6: ...RTM ATCA F125 Installation and Use 6806800K30C Contents 6 Contents Contents ...
Page 8: ...RTM ATCA F125 Installation and Use 6806800K30C 8 List of Tables ...
Page 10: ...RTM ATCA F125 Installation and Use 6806800K30C 10 List of Figures ...
Page 14: ...RTM ATCA F125 Installation and Use 6806800K30C About this Manual 14 About this Manual ...
Page 28: ...Hardware Preparation and Installation RTM ATCA F125 Installation and Use 6806800K30C 30 ...
Page 32: ...Controls LEDs and Connectors RTM ATCA F125 Installation and Use 6806800K30C 34 ...
Page 48: ...Related Documentation RTM ATCA F125 Installation and Use 6806800K30C 50 ...
Page 58: ...RTM ATCA F125 Installation and Use 6806800K30C Sicherheitshinweise 60 ...
Page 60: ...Index RTM ATCA F125 Installation and Use 6806800K30C 62 ...
Page 61: ......