Chapter 2
RTM-ATCA-F120-OPT Installation and Use (6806800G29B)
25
Hardware Preparation and Installation
2.1
Overview
This chapter describes all necessary steps you need to take in order to install the RTM-ATCA-
F120-OPT. The main steps are:
z
Inspect the shipment and unpack the RTM
z
Make sure environmental and power requirements are met
z
Install the RTM
2.2
Unpacking and Inspecting the RTM
To inspect the shipment, perform the following steps.
Shipment Inspection
1. Verify that you have received all items of your shipment:
Printed user manual (Getting Started guide)
RTM-ATCA-F120-OPT
Damage of Circuits
Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten their life.
Before touching the blade or electronic components, make sure that your are working in an
ESD-safe environment.
Summary of Contents for RTM-ATCA-F120-OPT
Page 6: ...RTM ATCA F120 OPT Installation and Use 6806800G29B 6 List of Tables ...
Page 8: ...RTM ATCA F120 OPT Installation and Use 6806800G29B 8 List of Figures ...
Page 22: ...Introduction RTM ATCA F120 OPT Installation and Use 6806800G29B 22 Figure 1 1 Overview ...
Page 62: ...Functional Description RTM ATCA F120 OPT Installation and Use 6806800G29B 62 ...
Page 64: ...Related Documentation RTM ATCA F120 OPT Installation and Use 6806800G29B 64 ...
Page 66: ...Index RTM ATCA F120 OPT Installation and Use 6806800G29B 66 ...
Page 67: ......