Emerson Process Management GmbH & Co. OHG
7-18
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2012
7.4.2 Manual Calibration
7.4.2 Manual Calibration
7.4.2.1 Manual Zero Calibration
Starting from the MEASUREMENT SCREEN
press
down
to open the MAIN MENU and
enter
CONTROL
.
To start a zero calibration select the first line
:
Multi-channel unit:
Select the channel to be calibrated in
SELECT COMPONENT.
Before selecting any further line
make sure the required calibra-
tion gas is applied and flowing!
Supply all calibration gases
with the same flow as the samp
-
le gas (recommeded approx. 1 l/
min), pressureless and utilizing
the correct gas fitting (
sect.
3.4).
Ensure the warm-up time after
switching on has elapsed!
Warm-up time is 15 to 50 minutes
depending on installed measu-
ring system and configuration!
The first line gives you the choice to cancel
the procedure now.
Select the second line to
start the calibra-
tion
.
Control..
Zero calibration..
Span calibration..
Advanced calibration..
Apply gas..
Lock menus!
Acknowledgements
Pump 1:
Off
Pump 2:
Off
Ranges..
Ch1
Zero calibration
Cancel!
Start!
Zero gas
0.000 ppm
Concentration
0.000 ppm
Flow
0.00 l/min
Status..
Results..
Restore!
Summary of Contents for Rosemount X-Stream Series
Page 535: ......