4
Commissioning the sensor
Commissioning allows the sensor to securely join a designated network and
communicate with a gateway. The IK220 installation kit comes with a
commissioning interface (CC21) and a tablet PC with the Permasense
installation application installed. The CC21 provides an electronic interface
between the ET310C sensor and the tablet PC during commissioning.
The CC21 commissioning cable is connected and removed from the
transmitter in the same way as BP20E power module. The CC21 USB
connector is plugged in to the tablet PC (see ).
Note
All the sensors connected to the network and Gateway must have the same
network ID and Join Key.
Procedure
1. Power up the rugged tablet PC and connect the CC21 commissioning
interface to the tablet PC USB port.
Figure 4-1: Commissioning Kit
A. Tablet PC
B. CC21 interface
C. USB cable
D. Rosemount Wireless Permasense Sensor
2. Double-click the Permasense installation application desktop icon.
Within approximately 10 seconds, the Permasense installation tool
software should open.
3. Attach the CC21 to the sensor.
4. In the installation application software:
Quick Start Guide
September 2022
14
Emerson.com/Rosemount
Summary of Contents for Rosemount ET310C
Page 4: ...Quick Start Guide September 2022 4 Emerson com Rosemount ...
Page 24: ...6 15 China RoHS Quick Start Guide September 2022 24 Emerson com Rosemount ...
Page 25: ...September 2022 Quick Start Guide Quick Start Guide 25 ...
Page 26: ...Quick Start Guide September 2022 26 Emerson com Rosemount ...
Page 27: ...September 2022 Quick Start Guide Quick Start Guide 27 ...