18. Apply power to the analyzer.
7.17
Closing the enclosure
After all internal connections have been made and proved/tested, close the enclosure and
secure the 20 off M16 x 45 captive screws in accordance with the torque sequence shown
below.
Procedure
1. Remove all protective masking tape covering the flamepath and enclosure sealing
gaskets.
2. Inspect the seal. If any damage is detected, stop the process immediately and
report to maintenance.
3. Clean the seal to remove any adhesive from the protective cover.
4. Inspect the flanges/flamepath for damage, i.e., scratches, chipping, or other forms
of damage/deformation. If any damage is detected, stop the process immediately
and report to maintenance.
5. Carefully lift up the housing and align with the rear housing.
6. Make sure that all holes are aligned.
If necessary, use the two holes to assist alignment.
Figure 7-46: Alignment Holes
Troubleshooting and diagnostics
Reference Manual
September 2019
00809-0100-5800
160
Emerson.com/Rosemount
Summary of Contents for Rosemount CT5800
Page 20: ...Contents Reference Manual September 2019 00809 0100 5800 xx Emerson com Rosemount ...
Page 34: ...Plan Reference Manual September 2019 00809 0100 5800 34 Emerson com Rosemount ...
Page 60: ...Startup procedure Reference Manual September 2019 00809 0100 5800 60 Emerson com Rosemount ...
Page 90: ...Gas calibration Reference Manual September 2019 00809 0100 5800 90 Emerson com Rosemount ...
Page 168: ...Shutdown procedure Reference Manual September 2019 00809 0100 5800 168 Emerson com Rosemount ...
Page 178: ...Theory of operation Reference Manual September 2019 00809 0100 5800 178 Emerson com Rosemount ...
Page 180: ...Spare parts list Reference Manual September 2019 00809 0100 5800 180 Emerson com Rosemount ...