16. Verify that the level gauge head is properly aligned. The cover on the terminal
compartment shall be parallel to the Verification Pin. The notch on the still-pipe
flange indicates the direction of the Verification Pin.
%
$
&
'
(
)
*
A. Rosemount 5900 Level Gauge
B. Pressure transmitter
C. Mark that indicates direction of the Verification Pin
D. Cover on the terminal compartment
E. Parallel
F. Verification Pin
G. Still-pipe
17. Wire the gauge, and configure by using the Rosemount TankMaster WinSetup
software as described in the Rosemount Tank Gauging
18. Configure the level gauge for LPG measurements (see
).
Installation
Reference Manual
September 2019
00809-0100-5900
76
Reference Manual
Summary of Contents for Rosemount 5900S Series
Page 1: ...Reference Manual 00809 0100 5900 Rev EA September 2019 Rosemount 5900S Radar Level Gauge ...
Page 6: ...Contents Reference Manual September 2019 00809 0100 5900 vi Reference Manual ...
Page 12: ...Introduction Reference Manual September 2019 00809 0100 5900 12 Reference Manual ...
Page 182: ...Configuration Reference Manual September 2019 00809 0100 5900 182 Reference Manual ...
Page 186: ...Operation Reference Manual September 2019 00809 0100 5900 186 Reference Manual ...
Page 266: ...Product Certifications Reference Manual September 2019 00809 0100 5900 266 Reference Manual ...