Figure 2-10: LPG/LNG Antenna
2.6
Installation procedure
Follow these steps for proper installation:
Procedure
1. Review installation considerations. See
.
2. Mount the gauge. See
.
4. Make sure covers and cable/conduit connections are tight.
5. Power up the gauge.
6. Configure the gauge. See
.
7. Verify measurements.
8. (Optional) Enable the Write Protection switch.
9. (Optional) SIL configuration.
Overview
Reference Manual
September 2019
00809-0100-5901
26
Reference Manual
Summary of Contents for Rosemount 5900C
Page 1: ...Reference Manual 00809 0100 5901 Rev DA September 2019 Rosemount 5900C Radar Level Gauge ...
Page 6: ...Contents Reference Manual September 2019 00809 0100 5901 vi Reference Manual ...
Page 12: ...Introduction Reference Manual September 2019 00809 0100 5901 12 Reference Manual ...
Page 116: ...Installation Reference Manual September 2019 00809 0100 5901 116 Reference Manual ...
Page 204: ...Configuration Reference Manual September 2019 00809 0100 5901 204 Reference Manual ...
Page 208: ...Operation Reference Manual September 2019 00809 0100 5901 208 Reference Manual ...
Page 290: ...Product Certifications Reference Manual September 2019 00809 0100 5901 290 Reference Manual ...