User Manual
Chapter 4
GFK-2847Y
Aug 2020
Pre-Installation Checks
43
Chapter 4:
Pre-installation Checks
This chapter provides information and procedures to perform pre-installation checks of the
QuickPanel
+
Operator Interface. Before installing and using the QuickPanel
+
, complete the
following procedures:
•
Section 4.1, Unpacking and Inspection
•
Section 4.2, Basic Set-up
•
Section 4.3, Initial Start-up
•
Section 4.4, Runtime Set-up
•
Section 4.5, Firmware Updates
•
Section 4.6, Shutdown
4.1
Unpacking and Inspection
Upon receipt of the QuickPanel
+
Operator Interface, carefully inspect all shipping containers
for damage. If any part of the system is damaged, notify the carrier immediately. Save the
damaged shipping container for inspection by the carrier. It is the consignee’s responsibility
to register a claim with the carrier for damage incurred during shipment.
Note:
For phone numbers and email addresses, refer to the section Contact Information at the
start of this manual.
After unpacking the unit, record all serial numbers. These are needed to contact Customer
Care during the warranty period. Save all shipping containers and packing material for
future transport or shipping. Verify that all system components have been received and
agree with the order. If the system received does not agree with your order, contact
Customer Care.
Before initial power-up, inspect the unit for loose or damaged components. If damage is
found (such as bent component leads or loose components), contact Emerson Automation
& Controls for additional instructions.
CAUTION
Do not apply power to the unit if it has visible damage. Applying power to a unit with
damaged components may cause additional damage.