User Manual
Chapter 7
GFK-2843A
Jan 2020
Startup and validation
46
Chapter 7:
Startup and validation
7.1
Initial startup
Table 16: Steps for parameterization and configuration (via VersaConf Safety Version
2.8 or later)
Step
Relevant section and literature
Carry out the necessary parameterization.
"Parameterization of the safety module" on page 30
Carry out the necessary parameterization for
the island satellites.
User manuals for the modules used
Configure the safety function.
Online help in VersaConf Safety
To start up, proceed as described in Table 17.
Table 17: Steps for startup
Step
Relevant section and literature
Set the transmission speed.
"Setting the DIP switches" on page 23
Set the address (island number).
"Setting the DIP switches" on page 23
Install the safety module within the
VersaPoint station.
"Assembly, removal, and electrical installation" on
page 22
Connect the bus system and supply voltage
cables to the
GFK-2736 user manual or documentation for the
bus coupler
VersaPoint station.
Wire the outputs according to your
application.
"Assembly, removal, and electrical installation" on
page 22
"VersaPoint potential and data routing, and
VersaPoint connectors" on page 17
User manuals for the functional blocks used
Before applying the operating voltage:
•
Ensure that there are no wiring errors
(e.g., cross cir- cuit or short circuit) or
grounding errors by testing with a
multimeter.
•
Check whether the ground connection is
safe.
Connect the required voltages to the
VersaPoint station.
GFK-2736 user manual or documentation for the
bus coupler, the VersaPoint controller or the power
terminal