14
IC695CPE400 Rackless CPU Quick Start Guide
GFK-3002G
Hardware Installation
Initial Checks
Upon receiving your equipment, carefully inspect all shipping containers for
damage. If any part of the system is damaged, notify the carrier
immediately. The damaged shipping container should be saved as evidence
for inspection by the carrier.
As the consignee, it is your responsibility to register a claim with the carrier
for damage incurred during shipment. Emerson will fully cooperate with
you, however, should such action be necessary.
After unpacking the equipment, record all serial numbers. Serial numbers
are required if you should need to contact Customer Care during the
warranty period. All shipping containers and all packing material should be
saved should it be necessary to transport or ship any part of the system.
Verify that all components of the system have been received and that they
agree with your order. If the system received does not agree with your
order, contact Customer Care.
Installation
As shipped, the CPE400 is intended for mounting on a DIN rail. A panel-
mount adaptor is also available. If panel-mounting is required, replace the
DIN-rail adaptor with the panel-mount adaptor using the screws supplied
with that adaptor. Both adaptors attach to the rear of the CPE400 chassis
using four Torx M3 screws. Torque newly-installed screws to 5.3 in-Ibs (0.6
Nm) if installing a new adaptor plate.