
May 2020
Installation, Operation and Maintenance Manual
VCIOM-15204-EN Rev. 1
16
Section 15: Maintenance
At least once a year a check should be make of your EIM HQ Series Actuator.
•
Disconnect all power to actuator.
•
Open Electrical Enclosure. Inspect and tighten all electrical connections
•
Visually inspect for any electrical or mechanical damage. Replace worn or
damaged components.
•
Check lubrication consistency and levels. Fill or replace if required.
Section 15: Maintenance
Maintenance