
7. Attach electrical output wiring from both pickoffs to terminal connection TB2 and
TB3.
8. Attach electrical output wiring from electrical accessories (conduit wiring) to
terminal connection TB1, number 3 for channel A, and number 5 for channel B.
9. Secure all electrical wiring.
10. Secure screws of preamplifier bracket in to the enclosure.
11. Return cover and secure.
9.8
Planned maintenance tasks
Table 9-2: Planned maintenance tasks
Task
Recommended action
Inspect
Implement a periodic inspection program to ensure all parts
are free from damage due to process, ambient or other
abnormal conditions.
•
Internal components: rotor, upstream to downstream
cone, etc.
•
Meter body housing, external flanges, flamepath.
•
Bolting
•
Electrical connections.
Clean
Use a non-toxic metal cleaning solvent.
Do not use common petrochemical solvents like Benzene,
Toluene or Xylene as they can pose potential health hazards.
Monitor corrosion / erosion / wear
A careful review of turbine meter proving history, such as
turbine meter factor control charts, can reveal potential
problems with turbine meter measurements. Examples
include bearing drag due to wear or an increased internal
cross-sectional area due to erosion.
Planned maintenance
User manual
March 2019
P/N 3-9008-515
98
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Summary of Contents for Daniel Series
Page 2: ...2 ...
Page 11: ...Part I Plan User manual Plan P N 3 9008 515 March 2019 User manual 11 ...
Page 69: ...Part II Install User manual Install P N 3 9008 515 March 2019 User manual 69 ...
Page 79: ...Part III Operate User manual Operate P N 3 9008 515 March 2019 User manual 79 ...
Page 83: ...Part IV Maintain User manual Maintain P N 3 9008 515 March 2019 User manual 83 ...
Page 105: ...User manual P N 3 9008 515 March 2019 User manual 105 ...