Locating and erecting the cabinets
37
Helios Candeo Power System
– AP6C75AA Installation Manual
Figure 3.16 – Installation of the frame earthquake bracing kit
P0916463
hex jam nut
(4 places)
P0432022
hex nut
(4 places)
P0912564
tapered bushing
(4 places)
P0909058
strap
(2 places)
P0382879
Lock washer
(4 places)
P0916467
button head screw
(4 places)
P0909060
relay rack
7 foot high
(not part of kit)
Note:
On one of the bracing bar, it may be necessary to relocate the
P0432022 hex nut behind the bar in order to clear some of the amber plastic
caps protecting the head of the screws holding the backbone in place. Do not
remove these plastic caps and be careful not to break these since the screws
are carrying the potential (+ or –) of the backbone portion they are holding.
3.10. Module installation
Once the physical installation of the frame(s) and associated hardware is
completed, install/reinstall the equipment modules that require cabling
operations (System Manager, Battery Connection Modules and Distribution
Modules).
Note:
Ensure that the mounting rails on each set of two adjacent modules are
properly engaged into each other before sliding the module into the frame in
order that each module is mounted in a perfect horizontal position and at the
appropriate level to match the mounting holes on the frame uprights. The top
of the framework is also equipped with a mounting rail to guide and secure
the first module at the top of the frame.
Summary of Contents for ASTEC Helios Candeo AP6C75AA
Page 2: ......
Page 4: ......
Page 12: ...12 Contents IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Page 95: ......