External grounding terminal
(recommended): Use a grounding cable with a
wire cross section in accordance to the local rules and standards. Emerson
recommends a grounding cable with a wire cross section of 6 mm
2
and a cable
lug at the end suitable for the diameter of the grounding screw.
•
Internal grounding terminal
(minimum requirement): Use a grounding cable
with a wire cross section equal to the wire cross section of the cable with the
hazardous live voltages and a cable lug at the end suitable for the diameter of
the grounding screw.
Ensure that the equipotential busbar is connected to protective ground.
2. Connect the shields of the field wiring cables to ground.
•
Field-side grounding
(recommended): Connect the shields of the field wiring
through the asset housing to ground. The grounding ensures the electrical
interferences are not conducted through the AMS Asset Monitor.
•
AMS Asset Monitor-side grounding
: Select this option if it is not possible to
connect the shield of the field wiring as described above. Connect the cable
shields to the internal grounding terminals (see
, A).
Note
Ensure that the cable shield is not double-sided connected to ground to avoid
ground loops. There may be exceptions to this recommendation.
4.11
Network connection
The AMS Asset Monitor is equipped with an 100 MBit/s Ethernet switch with two RJ-45
sockets to daisy chain up to eight AMS Asset Monitors and to connect this group of daisy
chained devices to an Area Controlled Network (ACN) for data exchange. Both RJ-45
sockets of the switch are equal. See the following diagram for an example of a network
architecture with a group of AMS Asset Monitor connected to an ACN and the subsequent
network architecture. There are three permissible network topologies for the AMS Asset
Monitor group. See
Installing AMS Asset Monitor hardware
Installation Guide
April 2020
MHM-97923-PBF
40
MHM-97923-PBF, Rev. 1.0
Summary of Contents for AMS
Page 8: ...Contents Installation Guide April 2020 MHM 97923 PBF viii MHM 97923 PBF Rev 1 0 ...
Page 14: ...General Installation Guide April 2020 MHM 97923 PBF 14 MHM 97923 PBF Rev 1 0 ...
Page 72: ...Removing CHARMs hardware Installation Guide April 2020 MHM 97923 PBF 72 MHM 97923 PBF Rev 1 0 ...
Page 86: ...Technical data Installation Guide April 2020 MHM 97923 PBF 86 MHM 97923 PBF Rev 1 0 ...
Page 88: ...Certificates Installation Guide April 2020 MHM 97923 PBF 88 MHM 97923 PBF Rev 1 0 ...
Page 89: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 89 ...
Page 90: ...Installation Guide April 2020 MHM 97923 PBF 90 MHM 97923 PBF Rev 1 0 ...
Page 91: ...Installation Guide MHM 97923 PBF April 2020 MHM 97923 PBF Rev 1 0 91 ...