3-150
Horizontal Alignment
Note
If a live move has been done in say the vertical direction, and fol-
lowing this you then go directly to the Horizontal Move screen (or
visa versa) and try to start the live move there, a warning message will
be displayed to inform you that a live move may have been done since
alignment data was last acquired. Once a live move is done in either
the vertical or horizontal direction, a second live move should not be
done in the perpendicular direction without first acquiring a new set
of laser readings. If you answer yes, then you will continue with the live
move. If you answer no, then the operation is aborted. This same mes-
sage is also displayed on an activated alignment job if a new set of data
has not been acquired since the job was activated.
Selecting the Live Move option from the Vertical Move screen displays the Vertical
Live Move screen. This screen displays the movement required to align the
machine vertically. The target indicates how close the machine vertical position is
to being in tolerance.
Summary of Contents for 2130 RBM Consultant Pro
Page 6: ...vi ...
Page 20: ...1 8 Fixtures Case Layout top section ...
Page 90: ...3 10 Horizontal Alignment ...
Page 364: ...5 22 Straightness Measurements ...