EMC2 40U-C Unpacking And Setup Manual Download Page 7

CL4692

Roll the cabinet down the ramp

NOTICE

Make certain the leveling feet are secured in the UP position before moving the cabinet.
Secured feet allow the cabinet to roll off the ramp and into position. If you need to adjust
the leveling feet, use an adjustable wrench and turn the feet clockwise to raise them to
the UP position.

EMC2845

Leveling
Feet

Rear

Rails

Unpacking and Setup Guide

Roll the cabinet down the ramp

     

7

Summary of Contents for 40U-C

Page 1: ...the latest version of this document l Before you start 2 l Tools required 2 l Hardware acclimation 3 l Steps to unpack and setup cabinet 3 l Remove the ramp and shipping material from the cabinet 4 l Remove the cabinet shipping brackets 5 l Attach the unloading ramp 6 l Roll the cabinet down the ramp 7 l Position and level the cabinet 9 l Attach optional brackets 9 l Install the lower rack bezel 1...

Page 2: ...nty installation and initialization policies Please dispose of shipping material responsibly and recycle wherever and whenever possible Cabinet packaging that includes a collapsible downloading ramp can be re packaged and returned as described in Repackaging shipping material 2 piece ramp kits only on page 12 CL5427 Note The illustrations in this guide are examples only Depending on what you order...

Page 3: ...nsation after the recommended acclimation time has passed allow an additional eight 8 hours to stabilize l Systems and components must not experience changes in temperature and humidity that are likely to cause condensation to form on or in that system or component Do not exceed the shipping and storage temperature gradient of 45 F hr 25 C hr l To facilitate environmental stabilization open both f...

Page 4: ...pping material from the cabinet Procedure 1 Remove any boxes and other material from the cabinet sides CL4691 2 Do not pull a ramp down from the top To release the ramp from the pallet grasp the ramp pull it straight back toward you then pull it straight up to free it from the screws 4 40U C Cabinet ...

Page 5: ...through the bracket to the rack and into the pallet 2 At the front of the cabinet remove the bottom rack bezel if necessary Pull the bezel straight out to remove it 3 Remove the bolts that attach the rack to the front shipping bracket Your can leave the front bracket attached to the shipping pallet Note Save the bolts You may need them later to install optional stabilizer brackets Unpacking and Se...

Page 6: ... the unloading ramp Procedure 1 Insert the ramp brackets into the pallet notches in the rear of the pallet EMC2843 Rear 2 If your shipment includes a two piece ramp attach part A to the pallet and part B to part A 6 40U C Cabinet ...

Page 7: ...fore moving the cabinet Secured feet allow the cabinet to roll off the ramp and into position If you need to adjust the leveling feet use an adjustable wrench and turn the feet clockwise to raise them to the UP position EMC2845 Leveling Feet Rear Rails Unpacking and Setup Guide Roll the cabinet down the ramp 7 ...

Page 8: ...s das Fundament gesichert ist bevor Sie das Gestell auf die Rampe rollen ATTENZIONE Poiché il cabinet è molto pesante assicurarsi di essere in un numero sufficiente di persone e di avere un appoggio sicuro prima di spingerlo sullo scivolo ADVERTENCIA El bastidor es pesado Asegúrese de contar con ayuda suficiente y de tener un apoyo seguro antes de colocar el bastidor en la rampa WARNING Balance th...

Page 9: ...the floor with stabilizing brackets Make sure the cabinet is in its final location before attaching the brackets then use the supplied bolts and mounting holes to attach them to the cabinet and floor Figure 1 Anti tip bracket installed on the front of cabinet CL4830 3 3 Unpacking and Setup Guide Position and level the cabinet 9 ...

Page 10: ...Figure 2 Anti move bracket installed on the front and back of cabinet CL4832 3 3 Figure 3 Seismic bracket installed on the front back and sides of the cabinet CL4833 3 3 3 3 10 40U C Cabinet ...

Page 11: ...9 2 Ground the cabinet Equipment correctly installed within the 40U C cabinet is grounded through the AC power cables and connectors In general supplemental grounding is not required If your site requires external grounding for example to a common grounding network beneath the site floor you can use the grounding lugs provided on each of the cabinet s lower power distribution panels PDP Unpacking ...

Page 12: ...ipping material 2 piece ramp kits only Follow these steps to repackage the 40U C shipping material Procedure 1 Lay each of the outer sleeves flat then fold it lengthwise before collapsing the three sections as shown 3 CL4690 1 2 2 Stack the shipping brackets on the pallet as shown 12 40U C Cabinet ...

Page 13: ...ide down on the pallet then stack section A right side up 4 Stack the two folded outer sleeves above the ramp sections 5 Apply the two collar sections to either side of the pallet hold them in place with the package hood Unpacking and Setup Guide Repackaging shipping material 2 piece ramp kits only 13 ...

Page 14: ...the carrier unpacked the cabinet the carrier handles the return shipment to the EMC packaging supplier l If the cabinet was unpacked after delivery refer to the contact number attached to the pamphlet for repacking This contact is the carrier network for the initial shipment and they will follow the same process as for the initial shipments 14 40U C Cabinet ...

Page 15: ...nd service contact you service provider For questions about upgrades contact your sales office More information about this and other products is available on the EMC Online Support website at http Support EMC com Unpacking and Setup Guide If you need help 15 ...

Page 16: ...e information in this publication and specifically disclaims implied warranties of merchantability or fitness for a particular purpose Use copying and distribution of any EMC software described in this publication requires an applicable software license EMC EMC and the EMC logo are registered trademarks or trademarks of EMC Corporation in the United States and other countries All other trademarks ...

Reviews: