EMC SVR-I2U-H2316 Installation And Maintenance Manual Download Page 1

EMC

®

 SVR-I2U-H2316 Server Installation and

Maintenance Guide

P/N 300-013-761
REV 03

March, 2015

This document describes installation and maintenance procedures for the SVR-I2U-H2316
server. This server has slots for sixteen 2.5-inch drive assemblies. Some server
components are replaceable as field replaceable units (FRUs). Refer to your product
documentation for information on which components are FRUs. Before attempting to
perform hardware service procedures, review your service contract because replacement of
some server components by unauthorized personnel may void service warranties.

l

Technical information and requirements

.................................................................... 2

l

Installing the server in a cabinet

.................................................................................3

l

Maintaining the server

............................................................................................. 14

l

Adding or replacing a compute node

........................................................................16

l

Replacing a disk drive assembly

.............................................................................. 19

l

Replacing a power supply

........................................................................................ 23

l

Replacing the server

.................................................................................................24

l

Removing the slide rails from the cabinet

.................................................................35

Summary of Contents for SVR-I2U-H2316

Page 1: ...ct documentation for information on which components are FRUs Before attempting to perform hardware service procedures review your service contract because replacement of some server components by una...

Page 2: ...power consumption and dissipation Requirement Description AC line voltage 90 264 V AC autoranging 47 63 Hz Power consumption operating maximum 1320 VA 1295 W maximum fully configured Heat dissipation...

Page 3: ...imum operating temperature is de rated 1 F 550 ft Shipping and storage requirements Table 4 Shipping and storage requirements Requirement Description Ambient temperature 40 C to 65 C 40 F to 149 F Tem...

Page 4: ...half of the cabinet when the lower half is empty Verifying the mounting kit parts Verify that the server mounting kit includes the parts listed in the table that follows Table 5 Mounting kit parts Com...

Page 5: ...e procedure that follows Refer to Figure 1 on page 6 while performing the procedure Procedure 1 Remove the screw that secures the alignment post assembly 2 Push the plastic tab on the alignment post a...

Page 6: ...orm the procedure that follows on each rail assembly Refer to Figure 2 on page 7 while performing the procedure Procedure 1 Slide the inner rail out from the slide rail as far as possible 2 On the inn...

Page 7: ...th the flat side of the inner rail facing the side of the server align the large end of the rail notches of the inner rail with the connection studs on the server and push the inner rail onto the conn...

Page 8: ...which the front and rear mounting channels are 24 inches to 34 inches apart Each assembly contains a right and a left slide rail Before you begin Select the 2 U 3 5 in of cabinet space for the server...

Page 9: ...connection is secure Figure 5 Inserting rail alignment posts into rear channel holes CL5090 2 Pull the slide rail forward so the front alignment posts go securely into the holes on the front channel...

Page 10: ...s avoir recours un relevage m canique et ou l aide d une autre personne Das Geh use ist schwer und sollte nur von zwei Personen in einem Rack installiert werden Zur Vermeidung von k rperlichen Verletz...

Page 11: ...he inner rails attached to the server with the white plastic guide block on the front inside of each slide rail Figure 9 on page 11 Note For clarity Figure 9 on page 11 shows the inner rail without th...

Page 12: ...tely into the cabinet Figure 11 on page 12 Figure 11 Inserting the server in the cabinet CL4989 Note Perform step 6 or step 7 as applicable to the quantity of stabilizer screws provided for the server...

Page 13: ...page 13 b Insert and tighten an M5 mounting screw in the upper screw hole of each bracket Figure 13 on page 13 Figure 13 Installing the server with four stabilizer screws CL5575 Connecting cables Proc...

Page 14: ...e bezel with the provided key and store the key in a secure place Figure 14 Installing the bezel CL4991 Powering up the server Power up the server as described in the documentation for your product Ma...

Page 15: ...server gather together the ESD kit and all other materials you will need Once servicing begins avoid moving away from the work site otherwise you may build up an electrostatic charge l Use the ESD ki...

Page 16: ...node Before you add a compute node review the section on handling field replaceable units FRUs To add a compute node to the server you must perform the tasks below in the order listed This section des...

Page 17: ...cing a faulted compute node Before you replace a faulted compute node review the section on handling field replaceable units FRUs To replace a faulted compute node in the server you must perform the t...

Page 18: ...and to your wrist and the enclosure in which you are installing the part 2 Unpack the part and place it on a static free surface 3 If the part is a replacement for a faulted part save the packing mate...

Page 19: ...appropriate ESD precautions including the use of a grounding strap when performing the drive module replacement procedure To replace a disk drive assembly you must perform the tasks below in the order...

Page 20: ...er A faulted disk drive assembly may have an amber LED indicator on its carrier which is visible when you remove the server s bezel Removing the bezel The front of the server may be covered by a bezel...

Page 21: ...y CL4985 Note The node control panel at right edge of the server slightly interferes with removal of the two disk drive assemblies located behind it As described in the following step grasping and pul...

Page 22: ...hen the lever begins to close by itself push on the lever to lock it into place Figure 22 Installing the replacement disk drive assembly CL4984 B A 6 Remove and store the ESD wristband Reinstalling th...

Page 23: ...ation on how to identify a faulted power supply in the server A faulted power supply may have an amber LED indicator which is visible from the rear of the server Replacing a faulted power supply Proce...

Page 24: ...n the retaining clip to secure the cord Replacing the server Replacement of non FRU server components by unauthorized personnel may void service warranties Refer to your product documentation for info...

Page 25: ...rds and I O cables from the back of the server 2 Label each cord and cable so you can easily identify them when you need to plug them into the replacement server Removing the bezel The front of the se...

Page 26: ...e autre personne Das Geh use ist schwer und sollte nur von zwei Personen in einem Rack installiert werden Zur Vermeidung von k rperlichen Verletzungen und oder der Besch digung des Ger tes bitte das G...

Page 27: ...ng screws Depending on when it was installed the server you are replacing may be secured with only the lower two stabilizing screws behind the latch brackets Procedure 1 Remove the stabilizing screws...

Page 28: ...t support the full weight of the server 4 Being prepared to support the full weight of the server slowly pull the server forward and remove it from the cabinet Figure 29 on page 28 Figure 29 Releasing...

Page 29: ...5 1 2 Unpacking a part Procedure 1 Attach an ESD wristband to your wrist and the enclosure in which you are installing the part 2 Unpack the part and place it on a static free surface 3 If the part is...

Page 30: ...ner rail with the connection studs on the server and push the inner rail onto the connection studs 2 Slide the inner rail forward along the server until the studs fit securely into the small end of th...

Page 31: ...son anheben und einbauen Il contenitore pesante e dev essere installato nel rack da due persone Per evitare danni personali e o all apparecchiatura non tentare di sollevare ed installare in un rack il...

Page 32: ...n page 32 Note For clarity Figure 33 on page 32 shows the inner rail without the server attached Figure 33 Aligning the inner rail with white plastic guide block CL5093 3 Slide the server into the cab...

Page 33: ...serting the server in the cabinet CL4989 Note Perform step 6 or step 7 as applicable to the quantity of stabilizer screws provided for the server installation l Perform step 6 if only two Phillips pan...

Page 34: ...8 32 screw directly behind each bezel latch Figure 37 on page 34 b Insert and tighten an M5 mounting screw in the upper screw hole of each bracket Figure 37 on page 34 Figure 37 Installing the server...

Page 35: ...ck the bezel with the provided key and store the key in a secure place Figure 38 Installing the bezel CL4991 Powering up the server Power up the server as described in the documentation for your produ...

Page 36: ...rear stabilizing screws CL4854 2 Release each rail from the channels Figure 40 on page 37 a At each rail end push and hold the alignment posts together b Slide the rail out of the channel and remove...

Page 37: ...Figure 40 Releasing the rail from the cabinet channels CL4856 Rear A B EMC SVR I2U H2316 Server Installation and Maintenance Guide Removing the slide rails from the cabinet 37...

Page 38: ...he information in this publication and specifically disclaims implied warranties of merchantability or fitness for a particular purpose Use copying and distribution of any EMC software described in th...

Reviews: