14
d. Figure 3.8 shows approved sidewall vent configuration
using an optional concentric vent termination kit. 2"
(54837) or 3" (54498).
8. Vertical Venting Configuration:
a. Figure 3.9 shows the approved venting configuration for
vertical venting using the standard fittings supplied.
b. Locate the air intake pipe inlet a minimum of 12" above
the expected snow accumulation on the roof surface.
c. Locate the end of the exhaust vent pipe a minimum of
12" above the inlet to the air intake pipe.
d. Figure 3.10 shows an approved vertical vent
configuration using the optional concentric vent
termination kit.
e. Figure 3.11 shows an option for routing the exhaust and
air inlet piping through an unused chimney.
f. Figure 3.12 shows this option using inlet air from a
sidewall position.
Figure 3.9: Standard Vertical Vent Installation
Figure 3.10: Concentric Vertical Vent Installation
Figure 3.11: Venting Through a Chimney Using
Outside Air
VENTING & AIR INLET PIPING
Summary of Contents for Peak-40
Page 22: ...22 WATER PIPING AND CONTROLS Figure 4 6 Recommended Central Heat Piping ...
Page 24: ...24 WATER PIPING AND CONTROLS Figure 4 8 Recommended Domestic Hot Water Piping ...
Page 33: ...33 ELECTRICAL CONNECTIONS Figure 7 4 Wiring Schematic and Connection ...
Page 47: ...47 START UP PROCEDURE E LIGHTING OPERATING PROCEDURES ...
Page 59: ...59 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 62: ...62 REPAIR PARTS Figure 13 2 Peak 40 LP Combustion Components ...
Page 64: ...64 REPAIR PARTS Figure 13 3 Peak 40 NG Combustion Components ...
Page 66: ...66 REPAIR PARTS Figure 13 4 CHB Parts Detail ...
Page 68: ...315 Oser Avenue Hauppauge NY 11788 Tel 631 694 1800 Fax 631 694 1832 www embassyind com ...