
H
ar
d
w
ar
e
In
st
all
at
io
n
Hardware Installation
User's Manual
2—16
PC_EYE®2+
2.7 Status-LEDs
They are 4 LEDs for several status information:
Figure 2—3: PC_EYE 250/260 LED
1
2
3
4
LED 1: Board selected - when the Configuration-Program is started, the
LED make a flash
LED 2: Capture - Acquisition in progress
LED 3: FiFo overrun - The FiFo run full
LED 4: FiFo Write Enable - valid data is written into the FiFo