
924KTE4.01 - KT
series humidifiers
05/2021
|29|
9.3 Cleaning the boiler
•
Dischargewaterfromthehumidifier(see
"8.2 MANUAL WATER DISCHARGE" ON PAGE 26
• Turn off the power from the machine using the external disconnector;
•
Openthepanelsofthehumidifierasdescribed
• Disconnect the electrode cables from the contactor;
•
Takecarenottodamagetheamperometrictransformer(AT)ontheelectronicboard;
• Disconnect the steam supply pipe at the top of the boiler;
• Disconnect the sleeve connector at the bottom of the boiler;
•
Unscrewthetwoscrewsonthetopofthehumidifieranddisconnectthesolenoidvalvethatfeedsthewater.
• Lift the boiler up slightly until it comes off its supports at the bottom and pull it straight out of the cabinet;
•
Placetheboilerinabucketwithasolutionofcitricacidoraceticacidovernight(theboilermustbecompletelyfilledwith
the solution);
• Remount the boiler.
9.4 Cleaning the optional stainless steel drain tank (accessory)
• Disconnect the basin from the drain;
•
Removethebasinfromthebottomofthehumidifier;
• Remove any built-up limescale and clean the basin under running water;
•
Placethebasinbackinitsoriginalpositionandreconnecttothedrain.
9.5 Replacing the boiler
•
Dischargewaterfromthehumidifier(see
"8.2 MANUAL WATER DISCHARGE" ON PAGE 26
• Turn off the power from the machine using the external disconnector;
•
Openthepanelsofthehumidifierasdescribed
•
Unscrewthetiethatblockstheinspectioncap;
•
Removetheplugandcleanthehumidifierofanylimescale;
•
Puttheinspectioncapandthetiebackinplace.
•
Unscrewthetwoscrewsonthetopofthehumidifieranddisconnectthesolenoidvalvethatfeedsthewater;
• Lift the boiler up slightly until it comes off its supports at the bottom and pull it straight out of the cabinet;
• Insert the new boiler as described
"9.6 INSTALLING THE BOILER" ON PAGE 29
;
•
DependingonthemodelofKThumidifierinstalled,makesurethecableconnectionsfromtheboileraretightened
properly (see
"6. ELECTRICAL CONNECTIONS" ON PAGE 18
);
•
MakesurethecablethatgoesfromtheboilertothecontactorgoesthroughthetransformerAT.
Fig. 26.
Passing the cable through the AT
9.6 Installing the boiler
• Place the boiler on its supports;
•
Connectthesolenoidvalvetofeedthewaterandscrewthetwoscrewsonthetopofthehumidifiertight;
• Insert the inspection cap and tighten the tie;
•
Insertthepanelsofthehumidifierasdescribed