5
Installation and commissioning
Ventilation Unit WL610
• Date of issue: 25.05.2011 • Technical changes reserved. Errors reserved.
Note:
The delivered colour tones are similar to the RAL colours specified. Deviations
due to technical reasons are possible. Due to the different nature of the surface of the
panel and ventilator housing, slightly different degrees of lustre can occur.
1.1.3. Ventilation levels
Order of the ventilation levels:
2.
Installation and commissioning
2.1. Notes on installation
Warning, mains voltage!
National legal regulations are to be observed.
Installation, inspection, commissioning and troubleshooting of the
device must only be carried out by a competent electrician.
Disconnect all lines to be assembled, and take safety precautions against accidental
switch-on.
The device is exclusively intended for appropriate use. With each inappropriate change
or non-observance of the instructions for use, any warranty or guarantee claim will be
void.
Level
Flap
Blower
Extraction 8
opened
runs, highest speed
Extraction 7
opened
runs
Extraction 6
opened
runs
Extraction 5
opened
runs
Extraction 4
opened
runs
Extraction 3
opened
runs
Extraction 2
opened
runs, lowest speed
Extraction 1
opened
stopped
Off
closed
stopped
Recirculation 1
closed
runs, lowest speed
Recirculation 2
closed
runs
Recirculation 3
closed
runs
Recirculation 4
closed
runs
Recirculation 5
closed
runs
Recirculation 6
closed
runs
Recirculation 7
closed
runs
Recirculation 8
closed
runs, highest speed