AM852 Veterinary Anaesthesia machine User’ Manual
17
4.2Check the system
Warning:
Ensure:
1. The equipment is in good condition.
2. All parts are connected correctly.
3. Respiration circuit and pipes are connected correctly and in good conditions,
and there are enough absorbent in absorber.
4. Lock evaporator to correct position and fill enough anaesthetic.
5. The connection and pressure of gas supply system are correct.
6. If there are spare gas cylinders, the valve of gas cylinder which is connected
to the system should be closed.
Warning:
When use pipe to provide air, the spare gas cylinder should not be open so
as to avoid that supply gas exhaust result in storing supply shortage when
pipeline is in trouble.
7.
T
he contingency equipment have already been prepared and in good
condition.
8. The equipment used to maintain airway, tracheal intubatton and manage
device have already been prepared and in good condition.
9. Applicable anaesthetic and contingency drug have already been prepared.
10. Anaesthesia gas spiritualization system has been connected correctly and in
good condition.
11. Ensure truckles are not loose and brake has been locked, can not move.
4.3Test gas supply pipe
Warning:
In order to prevent the equipment being damaged:
·
Open gas cylinder valve slowly
·
Do not take flowrate control forcefully.
1.Cut off all air feed linkages and close all gas cylinder valves.
If the values of pipe and gas cylinder pressure gauge are not zero,
then:
دﯾﯾﺎﻣرﻓ ﮫﻌﺟارﻣ.WWW.ELM-FAN.IRتﯾﺎﺳ ﮫﺑ رﺗﺷﯾﺑ دراوﻣ دوﻠﻧاد یارﺑ
To download more items, go to ELM-FAN.IR