18
USER MANUAL TPS/M 62000595 REV 03_
–
01/06/2021
2.1.2.1.3.
TPS/M/D 6K
•
Open the back terminal working on the two lateral hooks with a screwdriver.
•
Open the cable glands.
•
Join one supplying cable 3P+N+G according to the indications.
•
Make sure that the phases are join with the indicate sequence
•
1
–
phase L1
•
2
–
phase L2
•
3
–
phase L3
•
4 - free
•
5 - N
•
6 - Eart
•
On the back terminal are marked in a suitable way neutral and ground.
•
Use a cable of suitable section (max 5*6mm2)
•
Make sure that the phases are joined with the indicate sequence.
•
Reclose the cable glands.
•
Connect cable load with appropriate dimension and p
ut the ferrite
core on the load cable with 3 turns close to TPS/M/D
•
Reclose the terminal cover joining it on the two lateral hook
9
4
2
3
5
6
7
8
9
10
1
1.
4 wire sense voltage
2.
Power output
3.
GND
4.
Safety Switch
5.
Input supply
6.
Input fuse
7.
Input switch
8.
Comunication port
9.
Fan
10.
Ventilation grill
Summary of Contents for TPS/M/D
Page 1: ...1 USER MANUAL TPS M 62000595 REV 03_ 01 06 2021 TPS M D USER MANUAL ...
Page 13: ...13 USER MANUAL TPS M 62000595 REV 03_ 01 06 2021 1 4 3 TPS M D 6KVA 281 513 ...
Page 14: ...14 USER MANUAL TPS M 62000595 REV 03_ 01 06 2021 1 4 4 TPS M D 9KVA 281 513 ...
Page 25: ...25 USER MANUAL TPS M D 62000447 REV 00_ 31 08 2021 2 3 2 4 WIRE CONFIGURATION TPS M D TPS M D ...
Page 36: ...36 USER MANUAL TPS M D 62000447 REV 00_ 31 08 2021 Limitations is enable both AC and DC mode ...