
EN
02/08/22
User Manual RPS/T 20kVA 62000587_02_
30
9.
SERVICE AND MAINTENANCE
9.1.
MAINTENANCE / CLEANING
Your RPS/T
doesn’t
need any recurring maintenance, except for the one suggested in the
scheduled maintenance paragraph.
However, a cleaning schedule for the air filters and the fans can be optimal to keep 100%
functional your device. Cleaning frequency depends on the ambient condition.
Remember that heavily dirty filters and fans could lead to overheating problems and therefore to
machine failure.
9.1.1.
Scheduled maintenance
A planned maintenance schedule is suggested for keeping your RPS/T perfectly functional.
Machine maintenance is recommended after about these RPS/T working hours:
•
~
20000 Hours to change the fans;
•
~
40000 Hours to change the capacitors;
•
From 7 to 10 Years for general maintenance;
You can check the RPS/T working hours on the display (at the switching on) and via remote.
Please, note that it is necessary to return the machine to ELETTROTEST S.P.A for the scheduled
maintenance.
9.2.
ALARMS DIAGNOSIS AND REPAIRS
If one or more alarms are shown, the user
must not
try to repair the RPS/T by himself. Please
contact ELETTROTEST S.P.A service.
If the problem
doesn’t
solve even with the service support, the machine needs to return to the
supplier (with or without guarantee).
To return your RPS/T ensure that:
•
The device needs to be fully assembled and in a suitable transport packaging.
•
ELETTROTEST S.P.A needs to be contacted before the shipment.
•
A fault description needs to be attached.
•
If shipping is abroad, the necessary customs papers are attached.