background image

ePower / EE800W-POE 

Assembly (Fig. 1)

Since the battery and control board are already set up inside the control box, so the first step is 
install the solar panel connecters onto the control enclosure.

Adjust the solar panel holding bracket arms to match the size of the solar panel then put the solar 
panel on the arms and tight them by provided self-drilling screws on top and bottom (refer Fig.2, 

you will need a size 4mm wrench to adjust the screws on the arms).

Connect power load (IPC, Transceiver, etc.) and solar cables from the solar panel and the control 
enclosure. Make sure you connect them together at the right polarity and firmly. 

(Check color code 

on Page 2 for cable connections)

Mount the whole system on the pole (Only for pole mounting, 

you will need a size 6mm wrench to 

adjust the screws for bracket

) with the provided pole holding bracket.

Make sure the solar panel to face to directly sunlight (

South

) without any blocks or shadow. Push the 

main switch to ON position to activate device.

EE850W330-1,2C or EE8100W650-3,4C  

As package options, IP Camera setup, via Tech support:

Connect provided power cable/extension cable for 
each IPCs

Follow the IPC’s instruction to connect local Wi-Fi 
network, make sure IPC mounting locations cover by 
facility Wi-Fi signal

App online live chat or  directly: (866) 749-0567

IPC Tech support email: [email protected]

EE Systems Group Inc.

12346 Valley Blvd, Suite A, El Monte, CA 91732    Phone Number:  1-877-579-3889   www.eleding.com

Rev: 10/08/2019

Solar 100% Off-Grid Duel DC Power Generator

Installation Ways

Pole Mount as recommended, also works well on Ground/Floor or Wall Mount  

Thank you for choosing eLEDing! 

Package Includes: (IPCs options, refer Fig.3)

1 x Solar Panel; 1 x Mounting Bracket; 1 x Control Enclosure Built with Battery Pack; 1 x Pack of Screws 

INSTRUCTION

Note:

*Solar Panel must be mounted in a non-obstructed position that allows at least 5-6 hours direct sunlight all year round. For most of the North America 
projects. The solar panel can be pointed to east, west and south but 

definitely not to north

*For northern hemisphere installations, a south-facing position is best and visa-versa for southern hemisphere installation.
*Solar Panel Maintenance: Use soft, wet cloth to clean the solar panel periodically (at least once a one year) to avoid energy output reduction resulted from 
accumulated dust. Clean accumulated snow ASAP during snowing season.

EESGI guarantees this product to be free from defects in material & workmanship for (1) year. 
This warranty does not apply to damage from misuse or incorrect installation/ connection. 
This warranty does not cover accessories, bulbs, batteries, high voltage accidents, alterations, 
unauthorized use or repair, neglect, misuse, abuse, damages or defects resulting from normal 
wear and tear (including chips, fading scratches, abrasions or discoloration due to usage or sun 
exposure), or failure to follow instructions for care and maintenance, fire, flood, and Acts of God. 
This warranty does not include liability for incidental or consequential damages. 
EESGI is not responsible for any damages in excess of the retail purchase price of the product 
under any circumstances. The consumer is responsible for the installation of, removal of, and 
reinstallation of the product. 

One Year Limited Warranty

Fig. 1

2”to 4”

1

Fig. 3

Reviews: