background image

 

ERECTION OF H-POLES 

USING A STRIMECH  

(DEAD WORK) 

OHL 

Technique 

319 

 

Issue 1 
September 2020 

Section 2 

CP430 Part 1: Linesmen's Manual 

– Wood Pole and Mural Wiring 

© Electricity North West 2020 

Page 1 of 5 

 

1

 

Scope/Application

 

This OHL Technique covers erection of H-poles using a Strimech.  

2

 

Safety Information

 

 

Work shall be carried out in accordance with General Requirements in Section 1. Approved 
mandatory PPE and work wear shall be in accordance with General Requirements in 
Section 1. 

 

The task covered by this OHL Technique has significant hazards associated with it identified 
by the symbol and text 

CAUTION:

 

This OHL Technique details the risk control measures that must be applied when carrying out 
the task. If the risk control measures in this procedure are implemented the risks will be 
controlled. This OHL Technique also forms the method statement for the task. 

 
CAUTION: Loss of control of a wood pole can result in serious injury or death. Take care to 
ensure that poles are lifted, handled and moved correctly at all times.  
 

CAUTION: Avoid skin contact with wood poles; wear approved gloves when handling wood poles. Refer to 
the detailed information on creosote in Section 1.  
 
CAUTION: Where poles are to be erected close to HV live lines, take precautions in accordance with CP423. 
 
CAUTION: Ensure all personnel are clear of the backarm and pole during mechanical handling of the pole. 
 
CAUTION:

 

Before leaving the excavator, ensure the hydraulically operated parts of the excavator (i.e. the 

feet, front bucket and jib) are on the ground. The purpose of this is to prevent death or serious injury to 
personnel or damage to equipment caused by hydraulic or mechanical failure. 
 

3

 

Personnel

 

The minimum team number for this task is six Competent Persons. 

4

 

Preliminary Operations

 

Refer to Section 1 of this manual. 

 

 

Reviews: