Elecsys Tracker LT -- Test Post and Critical Bond Installation
Quick-Start Guide
TRACKER LT TEST POINT
INSTALLATION PROCEDURE
Step 1: Determine if the unit will be
mounted on the top of the test point
post or on the side of the post.
(For top of post mounting
, prep
the unit by feeding the cable through
the hole in the top of post adapter,
then using the screws, washers, and
nuts provided secure the adapter to
the unit.)
(For side of the post mounting
,
prep the unit by rerouting the signal
cable from the bottom of the unit to
the side of the unit. Remove the 4
screws in the top of the unit to gain
access inside and swap the cord
grip and plug already in the unit.
Replace the top and secure with the
4 screws.)
Step 2: Cut the cable to the proper
length for the test site and connect
the wires per the wiring diagram be-
low (Brown, Yellow, & optional Blue/
White wires). NOTE: Be sure to use
electrical tape to insulate unused
wires to eliminate possible shorts or
errant grounding.
Step 3:
For top mount installation
insert excess wire inside of post and
place top of post adapter in position
on the post. Use self-tapping screws
(not included) to secure the Tracker
LT unit to the post.
For side mount
installation
secure cable to post or
wall to allow for strain relief of the
connections.
Step 4: Call customer support to
configure the site.
TRACKER LT
CRITICAL BOND INSTALLATION
GUIDE
Step 1: Prep the unit by rerouting
the signal cable from the bottom of
the unit to the side of the unit.
Step 2: Remove the 4 screws in the
top of the unit to gain access inside
and swap the cord grip and plug
already in the unit.
Step 3: Thread cabling through cord
plug in the side of the unit.
Step 4: Replace the top and secure
with the 4 screws.
(continued on other side)
Package contents: Tracker LT Monitor Unit including connection harness cable and
antenna plus an adapter for 3” riser pipe installations.
*Please inspect package contents and immediately notify Elecsys Technical Support
at (913)825-6366 or email [email protected] if there are any discrepancies.
Installation Notes: Prior to beginning installation of this product, locate the serial num-
ber of the device on the label attached to the back of the enclosure and record it for
use in setting up the website with customer service.
IMPORTANT: Do not delay installation. Communication billing for this unit begins
upon installation or 90 days following product shipment, whichever comes first.
Ser. #______________________
Call Elecsys Customer Support for installation help - (913) 825-6366
Go to www.elecsyscorp.com/Installation for videos and manuals.