115
12. INPUT/OUTPUT TEST STEPS
12.6 Load and execute test plans (Input/Output)
Prerequisite: See chapter 12.5.
Note:
The execution of test plans is possible in manual mode or in auto-
matic mode. The setting is made in the menu "Setup - Test plan mode".
See also chapter 10.4 - illustr.. 10.41.
Test plan mode - step:
The start of test-steps must be done by
user-input (eg, push button).
Test plan mode - auto:
Test-steps are running as sequence au-
tomatically.. Only if "error" an operator intervention is required.
Choose "test plan" in the main menu.
Choose "Load test plan" in the main "test plan".
Choose the desired test plan at the list. See also chapter 10.5.
It is possible to edit the loaded test plan on this place (insert or delete
parameter blocks).
12.6.1
Start /execute test plan (auto- mode)
Note:
Test-steps are running as sequence automatically.
Fig. 12.23: Execute test plan
Full-electronic G1-1 HV DC-Tester
Summary of Contents for G1-1
Page 38: ...38 4 OPERATING MODES 4 2 2 Normal mode input step Full electronic G1 1 HV DC Tester...
Page 39: ...39 4 OPERATING MODES 4 2 3 Normal mode output step Full electronic G1 1 HV DC Tester...
Page 40: ...40 4 OPERATING MODES 4 2 4 Normal mode time step Full electronic G1 1 HV DC Tester...
Page 133: ...Expires 04 19 2016...