ekwb EK-Pro GPU Quick Disconnect Kit Installation Manual Download Page 1

INSTALLATION MANUAL

EK-Pro 

GPU Quick Disconnect Kit

GPU WATER BLOCK

Summary of Contents for EK-Pro GPU Quick Disconnect Kit

Page 1: ...INSTALLATION MANUAL EK Pro GPU Quick Disconnect Kit GPU WATER BLOCK...

Page 2: ...losure and warranty conditions printed on the back of the box Beforeyoustartusingthisproduct pleasefollowthesebasicguidelines Carefully read the manual before beginning with the installation process R...

Page 3: ...ABLE OF CONTENTS PREPARING THE WATER BLOCK 4 REMOVING THE TERMINAL 4 MOUNTING THE NEW TERMINAL 4 MOUNTING THE BARB FITTINGS 5 MOUNTING THE ZMT TUBE 5 MEASURING TUBES 6 SUPPORT AND SERVICE 8 SOCIAL MED...

Page 4: ...AL After you have cleaned the sealing surface assemble the terminal as shown in the picture Make sure that O rings are correctly placed into terminal channels Once the terminal is in the right positio...

Page 5: ...tely screwed in screw the barb fittings into the G1 4 threaded holes For tightening use a fork wrench 18 with torque adjustment set to 0 8 Nm STEP 3 STEP 4 STEP 4 MOUNTING THE ZMT TUBE For proper inst...

Page 6: ...make sure to avoid any sharp transitions of the tube to the barb fittings Take a look at the illustration for better understanding CORRECT WRONG Once the ZMT tubes and clamps are mounted make sure the...

Page 7: ...FC Terminal M4 Pre Filled1 pc M4x10DIN7984 Screw2pcs M4x28DIN7984 Screw1pcs BOX CONTENTS Check the box contents carefully The O rings might already be installed inside the terminal QD2 MSG4 Male QDC 2...

Page 8: ...you need assistance please contact http support ekwb com EKWB d o o Pod lipami 18 1218 Komenda Slovenia EU EKWaterBlocks EKWaterBlocks ekwaterblocks ekwaterblocks EKWBofficial SUPPORT AND SERVICE SOCI...

Reviews: