background image

Page  2 

 

 

 

 

Mounting of the Ekoheat pellet boiler

 

Mounting of the Ekoheat pellet boiler must be done in accordance to firetechnical guidelines, and 

must

 be mounted 

by an of Ekopower authorised technical assistant. 
It is also recommended by Ekopower to contact the chimney sweeper before mounting is started, and that the pellet 
boiler is carefully checked for damages occured during transportation. 
Do only mount the Ekoheat pellet boiler in an appropriate dry and insulated room with good ventilation. Please 
ensure that the boiler gets plenty of fresh air due to which it is demanded there is an opening in the boiler room to 
the outside of at least 20 cm

2

.  

The floor must not be of combustible material and must be plane, as it is required the boiler is levelled. (The legs must 
not be adjusted, as these keep the casing)  
When putting the boiler in place be careful as the covering of the boiler is ”loose” and is only resting on the bottom 
plate. It is recommended to demount the burner and the ashpan to minimize the weight. Remember the front gate 
must be mounted when pushing the boiler in space. 

  

Once the  boiler  is  levelled,  connect  it  to  the  chimney  with the  flue  gas  pipe.  Note  that  the  flue  gas  outlet  of the 
boiler is universal and can be mounted directly on top of or on the back of the boiler. If you choose the back side fit 
the prepared plate and move the cover plate on the back to the top of the boiler. You then do not have to fit the top 
plate.  
The flue pipe should not be more than 0,5 m long and must always be rising. If the flue pipe extend more than 0,5 
meter, or if bendings are mounted, then it must 

always

 be insulated. 

 

The draught in the chimney must be stable and not below 0,15 mb (15 Pa). If the draught varies more than +/- 0,05 
mBar, a draught stabilizer must be mounted. Mounting of a draught stabilizer in the chimney must minimum be 0,5 
meter above the flue gas inlet of the boiler. 

  

 

The enclosed retards must not be mounted at initial start-up. They can be mounted if the flue gas temperature 
extend more than 150

o

 constantly after 14 days. Please note that if retards are mounted all retards must be 

mounted. Eventually contact  Ekopower for more information.  
The Ekoheat pellet boiler 

must

 be mounted with shunt valve so that the return water is maximum 15

o

 lower than the 

flow temperature. The flow temperature 

must

 minimum be 60

o

C. 

 

 

Please note that if the flue pipe and the shunt valve not are correctly mounted the warranty will be null and void. 

 

 

Now place the hopper on the side of the boiler you prefer, and place the cover plate for the auger hole on the 
opposite side. Do the same for as well the boiler as the hopper. 

 

The whole control board must be demounted by 4 screws and place it carefully on the top of the boiler. Now the 
auger is carefully “reversed” pushed through the hole from the boiler and into the hopper. The auger is in place when 
the outlet is over the fall pipe of the boiler. Then mount the control board again and insert the plug from the auger in 
the control board. Note that there are 2 similar plugs where it says “Ekocompress” on one and “External feeder” on 
the other. The auger is mounted in “External feeder”.  

 

Summary of Contents for EkoHeat 1500

Page 1: ...are up dating Page 17 Technical specifications Page 18 Warranty Page 19 CE Marking Page 20 23 Test of approval Page 24 Marks of approval The pellet boiler from Ekopower has been tested by Dansk Teknol...

Page 2: ...not be more than 0 5 m long and must always be rising If the flue pipe extend more than 0 5 meter or if bendings are mounted then it must always be insulated The draught in the chimney must be stable...

Page 3: ...a time Calibration of the auger must be done before start up of the boiler as it then will not obtain the ultimate combustion and thus have a lower efficiency Press Menu user settings adjust calibrat...

Page 4: ...Boiler temperature 40 80 60 Here you set the wanted boiler temperature Should not be below 60 and always 10 higher than the set point of the shunt valve Fuel 0 Kilogram pellets which are added per hou...

Page 5: ...r is needed The temperature of this must be set under VVB priority Summer operation must be activated to do this and this can be checked by the appearance of a sun in the graphics on the front page De...

Page 6: ...this will run when the temperature of the boiler is above set point and stops when this is below again Ekopower recommends to set pump stop at 55 and the boiler temperature at 65 by engagement of summ...

Page 7: ...ill destroy the thread for the spindle Efficiency for flue suction 0 100 100 Here you can adjust how much air need to be added in proportion to efficiency in percent You can adjust per 10 These number...

Page 8: ...oiler temperature rises before the boiler stops and waits for a temperature drop The boiler starts again when the boiler temperature is below 45 degrees Max efficiency 20 100 60 The boiler can be set...

Page 9: ...ifferent flags as a symbol of which language you want on the boiler Menu Self Testing Here you can choose which type of boiler you have 900 1500 2500 4000 Test boiler is only for Ekopower authorised t...

Page 10: ...of wood pellets The ash can be used in the garden as compost The burner According to need take out the burner by loosening the two handles on each side of the burner The air vents which are placed in...

Page 11: ...ensor and the ash plate can be taken out and the slag can be removed Photo sensor Once a month check the photo sensor for dirt on the eye Pull it carefully out of its holder and clean the glass part w...

Page 12: ...Page 12 Electrical chart of the control...

Page 13: ...sive pipe pocket on the return water Draught stabilizer To be used by too much draught or by fluctuating draught to give a more even draught in the chimney Connection kit A connection kit is used betw...

Page 14: ...gnition error The amount of pellets for ignition is too small or too big The calibration might be incorrect The boiler must be calibrated If this does not help adjust the amount of pellets for ignitio...

Page 15: ...lation of slag on the ash plate Clean the ash plate for slag The screw stick is not greased with aluminium paste or the screw block is worn out Grease the screw stick with aluminium paste Change the s...

Page 16: ...Then carefully lift out the controller 3 The USB flash drive is inserted in the USB port app on the middle of the printed circuit board 4 Now press MENU in the display 5 Then press FITTERS SETTINGS an...

Page 17: ...s 74 liters 104 liters Min chimney draught 0 1 mBar 0 1 mBar 0 1 mBar 0 1 mBar Electrical connection 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt 230V 60Hz 1 5A 340 Watt Fue...

Page 18: ...the warranty D Ekopower reserve the right to send an external service company This can only be done by Ekopower The installer dealer who have no written agreement from Ekopower will not get any work...

Page 19: ...t EK OHEAT 900 EKOHEAT 1500 EK OHEAT 2500 EK OHEAT 4000 M tdi ine DndRie 3 1 CE stuvl 1 EN 3ffi 5 ffiM ng oo ilm fir solii mls hind M Ld i llltDin i lti cilly stDhd rom naJ hei 11 Cl llp1i a I to 300h...

Page 20: ...Page 20...

Page 21: ...Page 21...

Page 22: ...Page 22...

Page 23: ...Page 23 We do hope that you have got a good profit from this manual Should you have further questions please do not hesitate to contact us at post ekopower dk...

Reviews: