Action
Step
Connect the communication cable to the HEC-246 TCU port on the underside
of the I/O Cabinet.
Note:
The connectors and labels on your instrument may differ from the layout illus-
trated below.
3
Fill the vessel jacket
CAUTION
Slippery surface. Use caution when emptying the vessel jacket,
and when filling the vessel jacket with the coolant. Spilling the
coolant on the floor makes the floor slippery and may cause acci-
dents.
At least 39.5 L liquid is needed to fill the XDUO 2500 Mixer vessel jacket.
Follow the instructions below to fill the vessel jacket with the coolant.
Action
Step
Make sure that the vent valve and the drain valve of the mixer vessel jacket
are closed.
1
Xcellerex XDUO 2500 Mixer Operating Instructions 29146667 AH
135
5 Installation
5.5 Connect temperature control unit