Installation Check List
√
Required action
1)
Open / Unlock EFOY ProEnergyCase.
Battery connection
2)
Insert batterie(s).
3)
Connect battery terminals to installed battery clamps.
4)
Only 24 V: Connect batteries in series with 24 V battery connection cable.
EFOY Pro fuel cell connection
5)
Insert and the EFOY Pro fuel cell.
6)
Connect the exhaust hose.
7)
Connect the operating panel OP2 via data line to the EFOY Pro.
8)
Insert the EFOY fuel cartridge(s) into the foreseen space.
9)
Connect the EFOY fuel cartridge with to the fuel cartridge connector(s).
10)
Connect the EFOY Pro fuel cell to the battery via the pre-installed charge line
connector.
11)
Switch on the main switch of the EFOY ProEnergyCase.
The solar charge controller and the EFOY Pro fuel cell are now connected to the battery.
The info LED on both devices illuminates green. Check the operating panel for initial
configuration of the EFOY.
12)
Switch the EFOY Pro fuel cell manually on via the operating panel OP2 for a test
run. (Only possible if the battery voltage is lower than 13,2 V or 26,4 V)
13)
Connect the solar module to the solar charge controller. Ensure that the solar
module is protected from solar radiation for the duration of the installation.
14)
Connect the load (deactivated) to the solar charge controller and switch it on.
The EFOY ProEnergyCase is now ready for use, the load should be active.
15)
Check the solar charge controller, the EFOY Pro and the load for correct
operation.
16)
Close and lock the EFOY ProEnergyCase.
17)
Make sure that the air in- and outlet is not blocked and the maximum inclination
angles are not exceeded.