2 DELIVERY AND HANDLING
The crusher is usually shipped and delivered securely fixed onto a pallet, in a stable
position and appropriately wrapped in cellophane. The type of packaging can vary
according to the chosen means of transport and the destination. All the ordered
material is inspected before delivery to the customer.
CAUTION:
The packaging unloading must be performed with extreme care by means of a lifting
tool of appropriate capacity (e.g., forklift truck or other suitable means).
Then, the assembly must be positioned on a stable, horizontal surface.
Upon receipt, check the machine for any damage (breakages or major
denting) caused during transport. If so, it is necessary to immediately inform
the shipping company and to write on the Delivery note the “Accepted subject
to checking" clause.
In the event of damage, send a written complaint to the forwarder within 8
days of receipt.
Promptly inform Edilgrappa s.r.l. if major damage, caused during transport, is
found upon receipt, or if any parts are missing.
It is also necessary to check the delivered materials against the detailed
shipping list.