15
5 ROUTINE MAINTENANCE
1.
All maintenance, inspection and cleaning interventions on the machine
must be performed with the machine disconnected from the hydraulic
power unit and cold (see the person in charge in the maintenance
intervals table);
2.
Maintenance operations must be performed in a suitable place
according to current safety regulations;
3.
Before any maintenance intervention, thoroughly clean the machine
(see Paragraph 5.01);
4.
Wear suitable personal protective equipment while performing
maintenance work.
AT THE END OF EACH MAINTENANCE INTERVENTION ON THE
MACHINE, CHECK THAT ALL GUARDS HAVE BEEN CORRECTLY
REPLACED AND REINSTALLED
.
Periodic maintenance schedule
Frequency
Operation
Method
Person
EVERY 8
HOURS
CHECKING THE INTEGRITY OF
THE MACHINE
Visual
Operator
EVERY 8
HOURS
MACHINE CLEANING
Para 5.01
Operator
EVERY 8
HOURS
TIP WEAR CHECK
Visual
Operator
/
TIP REPLACEMENT
/
Authorised
personnel
EVERY 8
HOURS
CHECK THE TIGHTNESS OF
NUTS AND BOLTS
Para 5.02
Operator
EVERY 8
HOURS
PIN GREASING
Para 5.03
Operator