
C
HAPTER
3
| Installing the Switch
Mounting
– 39 –
M
OUNTING
The switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
R
ACK
-M
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
◆
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range. (
.)
◆
Mechanical Loading: Do not place any equipment on top of the rack-
mounted unit.
◆
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
Summary of Contents for ECS2000-50T
Page 1: ...Installation Guide www edge core com ECS2000 50T 50 Port Layer 2 Gigabit Ethernet Switch...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 16: ...ABOUT THIS GUIDE 16...
Page 19: ...CONTENTS 19 INDEX 64...
Page 20: ...CONTENTS 20...
Page 22: ...TABLES 22...
Page 29: ...CHAPTER 1 Introduction Overview 29...
Page 63: ...GLOSSARY 63...
Page 65: ...INDEX 65...
Page 66: ......
Page 67: ...ECS2000 50T E092012 MW R01...